首頁
關於福鈴
公司實績
海外合作廠商
聯絡我們
 
 

Relevant Project on Railway Track
Taiwan High Speed Rail
2016/1 Fullring implemented line adjustment of track by moving slab board. This work was realized first in Taiwan by Fullring. In the collapse part in the Slab track, it was restored by using CA mortar.




Design and Installation of RFID Logic Signal System to Crossing Gate Control in Alishan Forest Railway, Jiayi Forest Management, Bureau of Forestry
Chiayi Forest Land Management Division of Forestry
2015/12 Fullring implemented the design of the signal system. It realized the signal control system which introduced all directions caution light and a crossing gate from Japan and used.RFID.




Supply and Installation of Accessory System for Train Path on Main Track in Southern side from Hsinchu and on Depot Track
Taiwan High Speed Rail
2015/9 Fullring introduced The RFID into the maintenance vehicle. This made the maintenance vehicle possible to confirm it's route and location by connecting with the tag system which is installed on the main line.




   [1]   2  3 



ABOUT FULLRING | PERFORMANCE | OVERSEAS COOPERATION COMPANY | CONTACT US
No.26,Chaogui Rd.,Xitun Dist.,Taichung City,Taiwan.TEL: 886-4-2251-5787.FAX: 886-4-2251-3537 Copyright © FULLRING TECHNOLOGY CO., LTD. Web design by greatidea